| 3801 |
KU003801 |
General Supporting Requirements — 6.6 Example of FMECA |
no_media_needed |
| 3802 |
KU003802 |
General Supporting Requirements — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to prov |
no_media_needed |
| 3803 |
KU003803 |
General Supporting Requirements — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |
| 3804 |
KU003804 |
General Supporting Requirements — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 3805 |
KU003805 |
General Supporting Requirements — wy ai3 aes 23'S EOg we Ege , g <4 o 50 goo o = m | gga sos Ep bas s ° 5 Bes co 5 ie § Q ¢ = xc a Q A a rd 3 < ge Ee = =x |
no_media_needed |
| 3806 |
KU003806 |
General Supporting Requirements — Figure E.53 Recloser Data Record. |
no_media_needed |
| 3807 |
KU003807 |
General Supporting Requirements — me 28 BS a 2 te ga 20 && & a a a) eg fs 23 aE g vo. |
no_media_needed |
| 3808 |
KU003808 |
General Supporting Requirements — 1.1 Poor power quality is an undesirable deviation or interruption of the ideal power supply |
no_media_needed |
| 3809 |
KU003809 |
General Supporting Requirements — • (4) Reduced equipment performance and productivity • (5) Degraded data and communications Power quality disturbances c |
media_required |
| 3810 |
KU003810 |
General Supporting Requirements — Electrical noise • (8) Interharmonics • (9) Voltage fluctuations (light flicker) Examples demonstrate waveforms with com |
no_media_needed |
| 3811 |
KU003811 |
General Supporting Requirements — Figure J.1.1(b) Waveform of Sag Cleared by Supply Line Breaker Operation. |
no_media_needed |
| 3812 |
KU003812 |
General Supporting Requirements — Harmonics distort and change the rms magnitude of the waveform. |
no_media_needed |
| 3813 |
KU003813 |
General Supporting Requirements — 2.1 Harmonic Symptoms/Effects |
no_media_needed |
| 3814 |
KU003814 |
General Supporting Requirements — • (3) Nuisance operation of protective devices • (4) Unexplained blowing of fuses on power-factor correction capacitors |
no_media_needed |
| 3815 |
KU003815 |
General Supporting Requirements — 2.1 Example of Frequency Response Characteristic for a 1500 kVA, 13 |
media_required |
| 3816 |
KU003816 |
General Supporting Requirements — h= resonant frequency as a multiple of the fundamental frequency (Hz) Xc= shunt capacitive reactance of capacitor (ohms) |
no_media_needed |
| 3817 |
KU003817 |
General Supporting Requirements — Generators equipped with solid-state controls can also operate erratically in the presence of harmonics if the controls |
media_required |
| 3818 |
KU003818 |
General Supporting Requirements — 2.3 Harmonic Surveying and Testing |
no_media_needed |
| 3819 |
KU003819 |
General Supporting Requirements — 2.3.5 Harmonic distortion can vary significantly with load |
media_required |
| 3820 |
KU003820 |
General Supporting Requirements — Replacement of existing equipment with higher rated equipment • (3) Use of delta-wye- or delta-delta-connected transform |
no_media_needed |
| 3821 |
KU003821 |
General Supporting Requirements — 3.1 Transient Symptoms and Effects |
no_media_needed |
| 3822 |
KU003822 |
General Supporting Requirements — 3.2 Causes of Transients |
no_media_needed |
| 3823 |
KU003823 |
General Supporting Requirements — 3.4.2 Surge arresters are intended to be installed ahead of the service entrance equipment for limiting transient voltage by d |
no_media_needed |
| 3824 |
KU003824 |
General Supporting Requirements — | 400: e x & 5 S x % 2 300. |
no_media_needed |
| 3825 |
KU003825 |
General Supporting Requirements — 4.1 Symptoms of Sags and Swells |
no_media_needed |
| 3826 |
KU003826 |
General Supporting Requirements — 4.3 Monitoring and Testing for Sags and Swells |
no_media_needed |
| 3827 |
KU003827 |
General Supporting Requirements — 5.2 Causes of Long-Duration Undervoltage |
no_media_needed |
| 3828 |
KU003828 |
General Supporting Requirements — 6.1 illustrates the typical percentage increases in motor losses and heating for various levels of voltage unbalance |
no_media_needed |
| 3829 |
KU003829 |
General Supporting Requirements — 6.3 Monitoring and Testing of Unbalanced Voltages |
media_required |
| 3830 |
KU003830 |
General Supporting Requirements — 6.4.6 Fuses and protective devices in each phase should be checked and replaced as needed |
media_required |
| 3831 |
KU003831 |
General Supporting Requirements — 8.1 Symptoms of Noise |
no_media_needed |
| 3832 |
KU003832 |
General Supporting Requirements — 8.3 Monitoring and Testing of Noise |
no_media_needed |
| 3833 |
KU003833 |
General Supporting Requirements — 9.1 Symptoms of Interharmonics |
no_media_needed |
| 3834 |
KU003834 |
General Supporting Requirements — 9.2 Causes of Interharmonics |
no_media_needed |
| 3835 |
KU003835 |
General Supporting Requirements — 10.1 Voltage Fluctuations Symptoms |
no_media_needed |
| 3836 |
KU003836 |
General Supporting Requirements — 10.3 Voltage Fluctuations Monitoring and Testing |
no_media_needed |
| 3837 |
KU003837 |
General Supporting Requirements — Power quality audits are overall studies used to evaluate the overall power quality of the system. |
no_media_needed |
| 3838 |
KU003838 |
General Supporting Requirements — Table J.11 Typical Power Quality Parameters to be Monitored No. |
no_media_needed |
| 3839 |
KU003839 |
General Supporting Requirements — • (2) Securing the facility to limit damage • (3) Mobilization of recovery personnel • (4) Developing a safety plan • (5 |
media_required |
| 3840 |
KU003840 |
General Supporting Requirements — 2.1 The Initial Event |
no_media_needed |
| 3841 |
KU003841 |
General Supporting Requirements — 2.3 Mobilization of Recovery Personnel |
no_media_needed |
| 3842 |
KU003842 |
General Supporting Requirements — 2.3.3 Notification to Insurance Carrier |
no_media_needed |
| 3843 |
KU003843 |
General Supporting Requirements — When disaster events occur, there is often a loss of normal utility power. |
media_required |
| 3844 |
KU003844 |
General Supporting Requirements — 2.6 Initial Damage Assessment |
media_required |
| 3845 |
KU003845 |
General Supporting Requirements — All electrical components or equipment should be properly documented prior to removal to ensure the equipment is reinsta |
no_media_needed |
| 3846 |
KU003846 |
General Supporting Requirements — 2.7.1 Service Shop–Related Activities |
no_media_needed |
| 3847 |
KU003847 |
General Supporting Requirements — 2.7.7 Repair or Replace |
no_media_needed |
| 3848 |
KU003848 |
General Supporting Requirements — 2.7.7.3 Industry Standards and Guidelines |
no_media_needed |
| 3849 |
KU003849 |
General Supporting Requirements — Electrical Apparatus Service Association (EASA), ANSI/EASA AR100, Recommended Practice for the Repair of Rotating Electr |
media_required |
| 3850 |
KU003850 |
General Supporting Requirements — 2.8 Equipment |
no_media_needed |
| 3851 |
KU003851 |
General Supporting Requirements — 2.8.4 Power and Control Wiring |
no_media_needed |
| 3852 |
KU003852 |
General Supporting Requirements — Listing of equipment repaired or replaced • (3) Test results of all equipment tested before and after service or repairs |
no_media_needed |
| 3853 |
KU003853 |
General Supporting Requirements — L.2 Lack of Cleaning Program Causes Switchgear Damage. |
no_media_needed |
| 3854 |
KU003854 |
General Supporting Requirements — Figure L.5(a) A 20 cal/cm2 Arc Flash Suit Hanging on the Wall was Reduced to Ashes. |
media_required |
| 3855 |
KU003855 |
General Supporting Requirements — Figure L.5(b) All Six Circuit Breakers and Their Enclosures Were Destroyed. |
no_media_needed |
| 3856 |
KU003856 |
General Supporting Requirements — Figure L.5(c) Intense Heat Burned the Ceramic in the Arc Extinguishers. |
no_media_needed |
| 3857 |
KU003857 |
General Supporting Requirements — Figure L.5(d) All Bus Terminations and Insulation Were Destroyed. |
no_media_needed |
| 3858 |
KU003858 |
General Supporting Requirements — Figure L.5(e) All Metal Inside the Circuit Breaker Was Vaporized or Melted. |
no_media_needed |
| 3859 |
KU003859 |
General Supporting Requirements — 5.2 Million (US) Loss |
media_required |
| 3860 |
KU003860 |
General Supporting Requirements — 13.8 kV transformer, switchgear, and battery bank with charging system to support expanded production |
no_media_needed |
| 3861 |
KU003861 |
General Supporting Requirements — Figure L.7(a) The Circuit Breaker Fed This Battery Bank, which Lost All Power. |
no_media_needed |
| 3862 |
KU003862 |
General Supporting Requirements — Figure L.7(b) Transformer (foreground) and Reactor Destroyed by Fault Current. |
no_media_needed |
| 3863 |
KU003863 |
General Supporting Requirements — Resistive measurements of the motor windings were performed and recorded for six years. |
no_media_needed |
| 3864 |
KU003864 |
General Supporting Requirements — ewes Wk, ee) CH \ 4 ea ea ee | \) sean Fue bl Hef, AES | ae Se Ta Ta S| eee | FR Bearer els ol WA MA Res Ch See | 5 Beas |
no_media_needed |