| 3701 |
KU003701 |
General Supporting Requirements — Figure E.34 Typical Torque Value Record. |
media_required |
| 3702 |
KU003702 |
General Supporting Requirements — MAIN POWER ENERGIZATION CHECKLIST For use of this form see TM 5-694: the proponent agency is COE. |
no_media_needed |
| 3703 |
KU003703 |
General Supporting Requirements — Figure E.35 Typical Main Power Energization Checklist. |
no_media_needed |
| 3704 |
KU003704 |
General Supporting Requirements — Facility Identification Jok INSTRUCTIONS TO CONTRACTOR Date: Contractor Name: Address: —$——__$_$_$_$§_§_i City, State, Z |
media_required |
| 3705 |
KU003705 |
General Supporting Requirements — Figure E.36 Instructions to Contractor. |
no_media_needed |
| 3706 |
KU003706 |
General Supporting Requirements — Facility Identification Jol PROJECT SCOPE OF WORK Introduction This Scope of Work document will define the maintenance a |
no_media_needed |
| 3707 |
KU003707 |
General Supporting Requirements — Facility Identification Jol PROJECT SCOPE OF WORK (continued) Specific Task Description Contractor will perform the spec |
media_required |
| 3708 |
KU003708 |
General Supporting Requirements — Figure E.37 Project Scope of Work Template. |
no_media_needed |
| 3709 |
KU003709 |
General Supporting Requirements — PROJECT SCOPE OF WORK QUOTE FORM Location: Project No. |
no_media_needed |
| 3710 |
KU003710 |
General Supporting Requirements — Figure E.38 Project Scope of Work Form. |
media_required |
| 3711 |
KU003711 |
General Supporting Requirements — PROJECT SCOPE OF WORK MODIFICATION QUOTE FORM Location: Project No. |
no_media_needed |
| 3712 |
KU003712 |
General Supporting Requirements — Figure E.39 Project Scope of Work Modification Form. |
no_media_needed |
| 3713 |
KU003713 |
General Supporting Requirements — Figure E.40 Cover and Contents. |
no_media_needed |
| 3714 |
KU003714 |
General Supporting Requirements — POINTS OF CONTACT Installation: Address: Names Titles Office Symbols Phones Contractor’s Name: Address: Names Titles Off |
no_media_needed |
| 3715 |
KU003715 |
General Supporting Requirements — Figure E.41 Points of Contact. |
no_media_needed |
| 3716 |
KU003716 |
General Supporting Requirements — POWER DISTRIBUTION UNIT (PDU) SURVEY Date: Installation: Location: Power Distribution Unit (PDU) Identification: Manufac |
no_media_needed |
| 3717 |
KU003717 |
General Supporting Requirements — POWER DISTRIBUTION UNIT (PDU) SURVEY (continued) Deficiencies found Problems in the past Customer’s concerns |
no_media_needed |
| 3718 |
KU003718 |
General Supporting Requirements — Figure E.42 Power Distribution Unit (PDU) Survey. |
no_media_needed |
| 3719 |
KU003719 |
General Supporting Requirements — GENERATOR SET SURVEY Date: Installation: Location: Number of generator sets at this location: Generator Set #1 Physical |
media_required |
| 3720 |
KU003720 |
General Supporting Requirements — GENERATOR SET SURVEY (continued) Generator Set #3 Physical Conditions: Good condition ODamage ONotinuse UO Need repair Q |
no_media_needed |
| 3721 |
KU003721 |
General Supporting Requirements — Figure E.43 Generator Set Survey. |
no_media_needed |
| 3722 |
KU003722 |
General Supporting Requirements — ELECTRICAL PANEL SURVEY Date: Installation: Location: Panel Identification: Manufacturer Name: Panel Type/Model: Voltage |
no_media_needed |
| 3723 |
KU003723 |
General Supporting Requirements — ELECTRICAL PANEL SURVEY (continued) Other Circuit Breakers Circuit breaker rating: A 3 Ph or Single: How many CB: in the |
no_media_needed |
| 3724 |
KU003724 |
General Supporting Requirements — Figure E.44 Electrical Panel Survey. |
no_media_needed |
| 3725 |
KU003725 |
General Supporting Requirements — INVERTER SURVEY Date: Installation: Location: Inverter Identification: Number of inverters at this location: Do they all |
no_media_needed |
| 3726 |
KU003726 |
General Supporting Requirements — INVERTER SURVEY (continued) Deficiencies Found Problems in the Past Notes |
media_required |
| 3727 |
KU003727 |
General Supporting Requirements — Figure E.45 Inverter Survey. |
no_media_needed |
| 3728 |
KU003728 |
General Supporting Requirements — BUILDING LIGHTNING PROTECTION SURVEY Date: Installation: Building #: Physical Conditions O Good Condition O Rust/Corrosi |
media_required |
| 3729 |
KU003729 |
General Supporting Requirements — BUILDING LIGHTNING PROTECTION SURVEY (continued) Deficiencies Found Problems in the Past Sketch the roof floor plan and |
no_media_needed |
| 3730 |
KU003730 |
General Supporting Requirements — Figure E.46 Building Lightning Protection Survey. |
no_media_needed |
| 3731 |
KU003731 |
General Supporting Requirements — RECTIFIER SURVEY Date: Installation: Location: Rectifier Identification: Number of units at this location: Do they all h |
no_media_needed |
| 3732 |
KU003732 |
General Supporting Requirements — RECTIFIER SURVEY (continued) Deficiencies Found Problems in the Past Customer’s Concerns Notes |
no_media_needed |
| 3733 |
KU003733 |
General Supporting Requirements — Figure E.47 Rectifier Survey. |
no_media_needed |
| 3734 |
KU003734 |
General Supporting Requirements — ELECTRICAL PANEL SURVEY Date: Installation: Location: Panel Identification: Manufacturer Name: Panel Type/Model: Voltage |
media_required |
| 3735 |
KU003735 |
General Supporting Requirements — ELECTRICAL PANEL SURVEY (continued) Other Circuit Breakers CB rating: A How many CB: Conductor sizes: in the Panel CB ra |
no_media_needed |
| 3736 |
KU003736 |
General Supporting Requirements — Figure E.48 Electrical Panel Survey. |
no_media_needed |
| 3737 |
KU003737 |
General Supporting Requirements — TRANSFER SWITCHES SURVEY Date: Installation: Location: Transfer Switch Identification: Manufacturer Name: Model/Type: Se |
no_media_needed |
| 3738 |
KU003738 |
General Supporting Requirements — TRANSFER SWITCHES SURVEY (continued) Operation Scheme Make before break? |
no_media_needed |
| 3739 |
KU003739 |
General Supporting Requirements — Figure E.49 Transfer Switches Survey. |
no_media_needed |
| 3740 |
KU003740 |
General Supporting Requirements — POWER TRANSFORMERS SURVEY Date. |
no_media_needed |
| 3741 |
KU003741 |
General Supporting Requirements — POWER TRANSFORMERS SURVEY (continued) Temperature Winding temperature range: Bus temperature range: Enclosure temperatur |
media_required |
| 3742 |
KU003742 |
General Supporting Requirements — Figure E.50 Power Transformers Survey. |
no_media_needed |
| 3743 |
KU003743 |
General Supporting Requirements — UNINTERRUPTIBLE POWER SYSTEM SURVEY Date: Installation: Location: UPS System Identification: Number of modules: Do these |
no_media_needed |
| 3744 |
KU003744 |
General Supporting Requirements — UNINTERRUPTIBLE POWER SYSTEM SURVEY (continued) Batteries Manufacturer: Model: Type: Number of battery banks: Number of |
no_media_needed |
| 3745 |
KU003745 |
General Supporting Requirements — Figure E.51 Uninterruptible Power System Survey. |
no_media_needed |
| 3746 |
KU003746 |
General Supporting Requirements — a, EE 3 < i a 2 °| 2 S g| & 2 | [2| & a #| 3a 3| gs | as é 2 Z|e| # Zla| 2 a > 3 nt Oo ¢ a< wi 7 & c 3 S| & <a os g| § E |
no_media_needed |
| 3747 |
KU003747 |
General Supporting Requirements — Figure E.52 Low-Voltage Breaker Data Record. |
no_media_needed |
| 3748 |
KU003748 |
General Supporting Requirements — cfm oR low eo | | | | sr le] fertile: | | | 1 ee EOE @lO:rlerle| | | ft | Ee; | | | | [ | ye ESS: Glor1Qexi@er |_| seo e |
no_media_needed |
| 3749 |
KU003749 |
General Supporting Requirements — Figure F.1 NEMA Configurations for General-Purpose Nonlocking Plugs and Receptacles. |
no_media_needed |
| 3750 |
KU003750 |
General Supporting Requirements — yw [Poy [| [| | [| | Tt Tt dee [?] | ojoy | | | | | epee tet | ft | | ft [ fT fT fT amy | | | | | {| | ft ls [FESS PO lO |
media_required |
| 3751 |
KU003751 |
General Supporting Requirements — Figure F.2 NEMA Configurations for Locking Plugs and Receptacles. |
no_media_needed |
| 3752 |
KU003752 |
General Supporting Requirements — PRIMARY CONTACT MATRIX ome Fai ange Cd Information Technology (FY Manager Cd Hasardoos Material (Hoe Mat Team [TT eal Re |
no_media_needed |
| 3753 |
KU003753 |
General Supporting Requirements — PRIMARY CONTACT MATRIX (continued) eae Ftential energenay | Utity euply Cd fe a a! |
no_media_needed |
| 3754 |
KU003754 |
General Supporting Requirements — 1.1 Before storage, when equipment is received, it should be inspected for shipping damage, and reports should be made as re |
no_media_needed |
| 3755 |
KU003755 |
General Supporting Requirements — 2.1.2 Space heaters furnished with the equipment should be connected to a continuous source of power of the proper rating |
media_required |
| 3756 |
KU003756 |
General Supporting Requirements — 4.1 Indoor storage should be provided for all motors and generators except motors designed for outdoor use, which can be sto |
no_media_needed |
| 3757 |
KU003757 |
General Supporting Requirements — 4.7 Every 3 months, insulation resistance values of each winding of units rated 2300 volts and higher should be measured and |
media_required |
| 3758 |
KU003758 |
General Supporting Requirements — 5.1 Indoor storage should be provided for all transformers except the following: • (1) Transformers intended for outdoor ins |
no_media_needed |
| 3759 |
KU003759 |
General Supporting Requirements — 5.6 Primary Disconnect Switches |
media_required |
| 3760 |
KU003760 |
General Supporting Requirements — 7.2 Batteries that have been shipped dry and charged should have the seals inspected when they are received at the site |
media_required |
| 3761 |
KU003761 |
General Supporting Requirements — 1.1.2 Operational Availability |
no_media_needed |
| 3762 |
KU003762 |
General Supporting Requirements — 1.2.2 Preventive Maintenance |
no_media_needed |
| 3763 |
KU003763 |
General Supporting Requirements — 2.2 Increased Availability |
no_media_needed |
| 3764 |
KU003764 |
General Supporting Requirements — 3.1.3.3 Maintainability |
no_media_needed |
| 3765 |
KU003765 |
General Supporting Requirements — 0.993467721 Accumulator, Pressurized |
no_media_needed |
| 3766 |
KU003766 |
General Supporting Requirements — 0.998149212 Above Ground 0 |
no_media_needed |
| 3767 |
KU003767 |
General Supporting Requirements — 0.986993503 Chiller, Screw, >300 Tons |
no_media_needed |
| 3768 |
KU003768 |
General Supporting Requirements — 0.988952766 Control Panel, HVAC/Chillers/AHUs, wo/Switchgear |
no_media_needed |
| 3769 |
KU003769 |
General Supporting Requirements — 0.998510134* Mechanical 0 |
no_media_needed |
| 3770 |
KU003770 |
General Supporting Requirements — 0.957963867 Motor Starter 0 |
media_required |
| 3771 |
KU003771 |
General Supporting Requirements — 0.998103531* Piping, Water, >8 ≤12 in |
no_media_needed |
| 3772 |
KU003772 |
General Supporting Requirements — 0.993744427 Automatic Transfer 0 |
no_media_needed |
| 3773 |
KU003773 |
General Supporting Requirements — 0.993549151 Receiver 0 |
no_media_needed |
| 3774 |
KU003774 |
General Supporting Requirements — 0.990661925 UPS, Small Computer Room Floor |
no_media_needed |
| 3775 |
KU003775 |
General Supporting Requirements — 0.992808232 Valve Operator, Electric |
no_media_needed |
| 3776 |
KU003776 |
General Supporting Requirements — 6.4 The purpose of preventive maintenance is not to prevent every component failure from occurring but to prevent the system |
no_media_needed |
| 3777 |
KU003777 |
General Supporting Requirements — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 3778 |
KU003778 |
General Supporting Requirements — 6.5 Basic Block Diagram of the RCM Process |
no_media_needed |
| 3779 |
KU003779 |
General Supporting Requirements — 6.6 Example of FMECA |
no_media_needed |
| 3780 |
KU003780 |
General Supporting Requirements — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to prov |
media_required |
| 3781 |
KU003781 |
General Supporting Requirements — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |
| 3782 |
KU003782 |
General Supporting Requirements — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 3783 |
KU003783 |
General Supporting Requirements — 1.1 Availability |
no_media_needed |
| 3784 |
KU003784 |
General Supporting Requirements — 1.2.1 Corrective Maintenance |
no_media_needed |
| 3785 |
KU003785 |
General Supporting Requirements — 1.4 Reliability-Centered Maintenance (RCM) |
no_media_needed |
| 3786 |
KU003786 |
General Supporting Requirements — 3.1.3 Basic Reliability |
no_media_needed |
| 3787 |
KU003787 |
General Supporting Requirements — Table I.4 Reliability and Maintainability Information for RCM Analysis Calculated Data Formula for Calculation Ai, Inher |
no_media_needed |
| 3788 |
KU003788 |
General Supporting Requirements — 0.993006248 Battery, Gel Cell-Sealed, Strings |
no_media_needed |
| 3789 |
KU003789 |
General Supporting Requirements — 0.992748496 Cable, Insulated, DC, Per 100 ft |
no_media_needed |
| 3790 |
KU003790 |
General Supporting Requirements — 0.994487152 Vacuum 0 |
media_required |
| 3791 |
KU003791 |
General Supporting Requirements — 0.978172315 Drive, Adjustable Speed |
no_media_needed |
| 3792 |
KU003792 |
General Supporting Requirements — 0.996596565 Heat Exchanger, Water To Water |
no_media_needed |
| 3793 |
KU003793 |
General Supporting Requirements — 0.161029030 Motor, Mechanical, Gas |
no_media_needed |
| 3794 |
KU003794 |
General Supporting Requirements — 0.998867884 Sending Unit, Air Velocity |
no_media_needed |
| 3795 |
KU003795 |
General Supporting Requirements — 0.996326697 Switch, Static, >600 ≤1000 amp |
no_media_needed |
| 3796 |
KU003796 |
General Supporting Requirements — 0.999393210* Transformer, Dry, Air Cooled, >500kVA ≤1500kVA |
no_media_needed |
| 3797 |
KU003797 |
General Supporting Requirements — 0.999827547 Valve, Gate, N |
no_media_needed |
| 3798 |
KU003798 |
General Supporting Requirements — 6.1 Part of an effective RCM program is to determine the failure modes effects and conduct criticality analysis (FMECA) of a |
no_media_needed |
| 3799 |
KU003799 |
General Supporting Requirements — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 3800 |
KU003800 |
General Supporting Requirements — 6.5 Basic Block Diagram of the RCM Process |
media_required |