| 2101 |
KU002101 |
Inspection, Testing, and Maintenance Tasks — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 2102 |
KU002102 |
Inspection, Testing, and Maintenance Tasks — 1.1 Availability |
no_media_needed |
| 2103 |
KU002103 |
Inspection, Testing, and Maintenance Tasks — 1.2.1 Corrective Maintenance |
no_media_needed |
| 2104 |
KU002104 |
Inspection, Testing, and Maintenance Tasks — 1.4 Reliability-Centered Maintenance (RCM) |
no_media_needed |
| 2105 |
KU002105 |
Inspection, Testing, and Maintenance Tasks — 3.1.3 Basic Reliability |
no_media_needed |
| 2106 |
KU002106 |
Inspection, Testing, and Maintenance Tasks — Table I.4 Reliability and Maintainability Information for RCM Analysis Calculated Data Formula for Calculation Ai, Inher |
no_media_needed |
| 2107 |
KU002107 |
Inspection, Testing, and Maintenance Tasks — 0.993006248 Battery, Gel Cell-Sealed, Strings |
no_media_needed |
| 2108 |
KU002108 |
Inspection, Testing, and Maintenance Tasks — 0.992748496 Cable, Insulated, DC, Per 100 ft |
no_media_needed |
| 2109 |
KU002109 |
Inspection, Testing, and Maintenance Tasks — 0.994487152 Vacuum 0 |
media_required |
| 2110 |
KU002110 |
Inspection, Testing, and Maintenance Tasks — 0.978172315 Drive, Adjustable Speed |
no_media_needed |
| 2111 |
KU002111 |
Inspection, Testing, and Maintenance Tasks — 0.996596565 Heat Exchanger, Water To Water |
no_media_needed |
| 2112 |
KU002112 |
Inspection, Testing, and Maintenance Tasks — 0.161029030 Motor, Mechanical, Gas |
no_media_needed |
| 2113 |
KU002113 |
Inspection, Testing, and Maintenance Tasks — 0.998867884 Sending Unit, Air Velocity |
no_media_needed |
| 2114 |
KU002114 |
Inspection, Testing, and Maintenance Tasks — 0.996326697 Switch, Static, >600 ≤1000 amp |
no_media_needed |
| 2115 |
KU002115 |
Inspection, Testing, and Maintenance Tasks — 0.999393210* Transformer, Dry, Air Cooled, >500kVA ≤1500kVA |
no_media_needed |
| 2116 |
KU002116 |
Inspection, Testing, and Maintenance Tasks — 0.999827547 Valve, Gate, N |
no_media_needed |
| 2117 |
KU002117 |
Inspection, Testing, and Maintenance Tasks — 6.1 Part of an effective RCM program is to determine the failure modes effects and conduct criticality analysis (FMECA) of a |
no_media_needed |
| 2118 |
KU002118 |
Inspection, Testing, and Maintenance Tasks — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 2119 |
KU002119 |
Inspection, Testing, and Maintenance Tasks — 6.5 Basic Block Diagram of the RCM Process |
media_required |
| 2120 |
KU002120 |
Inspection, Testing, and Maintenance Tasks — 6.6 Example of FMECA |
no_media_needed |
| 2121 |
KU002121 |
Inspection, Testing, and Maintenance Tasks — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to p |
no_media_needed |
| 2122 |
KU002122 |
Inspection, Testing, and Maintenance Tasks — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |
| 2123 |
KU002123 |
Inspection, Testing, and Maintenance Tasks — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 2124 |
KU002124 |
Inspection, Testing, and Maintenance Tasks — wy ai3 aes 23'S EOg we Ege , g <4 o 50 goo o = m | gga sos Ep bas s ° 5 Bes co 5 ie § Q ¢ = xc a Q A a rd 3 < ge Ee = =x |
no_media_needed |
| 2125 |
KU002125 |
Inspection, Testing, and Maintenance Tasks — Figure E.53 Recloser Data Record. |
no_media_needed |
| 2126 |
KU002126 |
Inspection, Testing, and Maintenance Tasks — me 28 BS a 2 te ga 20 && & a a a) eg fs 23 aE g vo. |
no_media_needed |
| 2127 |
KU002127 |
Inspection, Testing, and Maintenance Tasks — 1.1 Poor power quality is an undesirable deviation or interruption of the ideal power supply |
no_media_needed |
| 2128 |
KU002128 |
Inspection, Testing, and Maintenance Tasks — • (4) Reduced equipment performance and productivity • (5) Degraded data and communications Power quality disturbances c |
media_required |
| 2129 |
KU002129 |
Inspection, Testing, and Maintenance Tasks — Electrical noise • (8) Interharmonics • (9) Voltage fluctuations (light flicker) Examples demonstrate waveforms with com |
no_media_needed |
| 2130 |
KU002130 |
Inspection, Testing, and Maintenance Tasks — Figure J.1.1(b) Waveform of Sag Cleared by Supply Line Breaker Operation. |
no_media_needed |
| 2131 |
KU002131 |
Inspection, Testing, and Maintenance Tasks — Harmonics distort and change the rms magnitude of the waveform. |
no_media_needed |
| 2132 |
KU002132 |
Inspection, Testing, and Maintenance Tasks — 2.1 Harmonic Symptoms/Effects |
no_media_needed |
| 2133 |
KU002133 |
Inspection, Testing, and Maintenance Tasks — • (3) Nuisance operation of protective devices • (4) Unexplained blowing of fuses on power-factor correction capacitors |
no_media_needed |
| 2134 |
KU002134 |
Inspection, Testing, and Maintenance Tasks — 2.1 Example of Frequency Response Characteristic for a 1500 kVA, 13 |
media_required |
| 2135 |
KU002135 |
Inspection, Testing, and Maintenance Tasks — h= resonant frequency as a multiple of the fundamental frequency (Hz) Xc= shunt capacitive reactance of capacitor (ohms) |
no_media_needed |
| 2136 |
KU002136 |
Inspection, Testing, and Maintenance Tasks — Generators equipped with solid-state controls can also operate erratically in the presence of harmonics if the controls |
media_required |
| 2137 |
KU002137 |
Inspection, Testing, and Maintenance Tasks — 2.3 Harmonic Surveying and Testing |
no_media_needed |
| 2138 |
KU002138 |
Inspection, Testing, and Maintenance Tasks — 2.3.5 Harmonic distortion can vary significantly with load |
media_required |
| 2139 |
KU002139 |
Inspection, Testing, and Maintenance Tasks — Replacement of existing equipment with higher rated equipment • (3) Use of delta-wye- or delta-delta-connected transform |
no_media_needed |
| 2140 |
KU002140 |
Inspection, Testing, and Maintenance Tasks — 3.1 Transient Symptoms and Effects |
no_media_needed |
| 2141 |
KU002141 |
Inspection, Testing, and Maintenance Tasks — 3.2 Causes of Transients |
no_media_needed |
| 2142 |
KU002142 |
Inspection, Testing, and Maintenance Tasks — 3.4.2 Surge arresters are intended to be installed ahead of the service entrance equipment for limiting transient voltage by |
no_media_needed |
| 2143 |
KU002143 |
Inspection, Testing, and Maintenance Tasks — | 400: e x & 5 S x % 2 300. |
no_media_needed |
| 2144 |
KU002144 |
Inspection, Testing, and Maintenance Tasks — 4.1 Symptoms of Sags and Swells |
no_media_needed |
| 2145 |
KU002145 |
Inspection, Testing, and Maintenance Tasks — 4.3 Monitoring and Testing for Sags and Swells |
no_media_needed |
| 2146 |
KU002146 |
Inspection, Testing, and Maintenance Tasks — 5.2 Causes of Long-Duration Undervoltage |
no_media_needed |
| 2147 |
KU002147 |
Inspection, Testing, and Maintenance Tasks — 6.1 illustrates the typical percentage increases in motor losses and heating for various levels of voltage unbalance |
no_media_needed |
| 2148 |
KU002148 |
Inspection, Testing, and Maintenance Tasks — 6.3 Monitoring and Testing of Unbalanced Voltages |
media_required |
| 2149 |
KU002149 |
Inspection, Testing, and Maintenance Tasks — 6.4.6 Fuses and protective devices in each phase should be checked and replaced as needed |
media_required |
| 2150 |
KU002150 |
Inspection, Testing, and Maintenance Tasks — 8.1 Symptoms of Noise |
no_media_needed |
| 2151 |
KU002151 |
Inspection, Testing, and Maintenance Tasks — 8.3 Monitoring and Testing of Noise |
no_media_needed |
| 2152 |
KU002152 |
Inspection, Testing, and Maintenance Tasks — 9.1 Symptoms of Interharmonics |
no_media_needed |
| 2153 |
KU002153 |
Inspection, Testing, and Maintenance Tasks — 9.2 Causes of Interharmonics |
no_media_needed |
| 2154 |
KU002154 |
Inspection, Testing, and Maintenance Tasks — 10.1 Voltage Fluctuations Symptoms |
no_media_needed |
| 2155 |
KU002155 |
Inspection, Testing, and Maintenance Tasks — 10.3 Voltage Fluctuations Monitoring and Testing |
no_media_needed |
| 2156 |
KU002156 |
Inspection, Testing, and Maintenance Tasks — Power quality audits are overall studies used to evaluate the overall power quality of the system. |
no_media_needed |
| 2157 |
KU002157 |
Inspection, Testing, and Maintenance Tasks — Table J.11 Typical Power Quality Parameters to be Monitored No. |
no_media_needed |
| 2158 |
KU002158 |
Inspection, Testing, and Maintenance Tasks — • (2) Securing the facility to limit damage • (3) Mobilization of recovery personnel • (4) Developing a safety plan • (5 |
media_required |
| 2159 |
KU002159 |
Inspection, Testing, and Maintenance Tasks — 2.1 The Initial Event |
no_media_needed |
| 2160 |
KU002160 |
Inspection, Testing, and Maintenance Tasks — 2.3 Mobilization of Recovery Personnel |
no_media_needed |
| 2161 |
KU002161 |
Inspection, Testing, and Maintenance Tasks — 2.3.3 Notification to Insurance Carrier |
no_media_needed |
| 2162 |
KU002162 |
Inspection, Testing, and Maintenance Tasks — When disaster events occur, there is often a loss of normal utility power. |
media_required |
| 2163 |
KU002163 |
Inspection, Testing, and Maintenance Tasks — 2.6 Initial Damage Assessment |
media_required |
| 2164 |
KU002164 |
Inspection, Testing, and Maintenance Tasks — All electrical components or equipment should be properly documented prior to removal to ensure the equipment is reinsta |
no_media_needed |
| 2165 |
KU002165 |
Inspection, Testing, and Maintenance Tasks — 2.7.1 Service Shop–Related Activities |
no_media_needed |
| 2166 |
KU002166 |
Inspection, Testing, and Maintenance Tasks — 2.7.7 Repair or Replace |
no_media_needed |
| 2167 |
KU002167 |
Inspection, Testing, and Maintenance Tasks — 2.7.7.3 Industry Standards and Guidelines |
no_media_needed |
| 2168 |
KU002168 |
Inspection, Testing, and Maintenance Tasks — Electrical Apparatus Service Association (EASA), ANSI/EASA AR100, Recommended Practice for the Repair of Rotating Electr |
media_required |
| 2169 |
KU002169 |
Inspection, Testing, and Maintenance Tasks — 2.8 Equipment |
no_media_needed |
| 2170 |
KU002170 |
Inspection, Testing, and Maintenance Tasks — 2.8.4 Power and Control Wiring |
no_media_needed |
| 2171 |
KU002171 |
Inspection, Testing, and Maintenance Tasks — Listing of equipment repaired or replaced • (3) Test results of all equipment tested before and after service or repairs |
no_media_needed |
| 2172 |
KU002172 |
Inspection, Testing, and Maintenance Tasks — L.2 Lack of Cleaning Program Causes Switchgear Damage. |
no_media_needed |
| 2173 |
KU002173 |
Inspection, Testing, and Maintenance Tasks — Figure L.5(a) A 20 cal/cm2 Arc Flash Suit Hanging on the Wall was Reduced to Ashes. |
media_required |
| 2174 |
KU002174 |
Inspection, Testing, and Maintenance Tasks — Figure L.5(b) All Six Circuit Breakers and Their Enclosures Were Destroyed. |
no_media_needed |
| 2175 |
KU002175 |
Inspection, Testing, and Maintenance Tasks — Figure L.5(c) Intense Heat Burned the Ceramic in the Arc Extinguishers. |
no_media_needed |
| 2176 |
KU002176 |
Inspection, Testing, and Maintenance Tasks — Figure L.5(d) All Bus Terminations and Insulation Were Destroyed. |
no_media_needed |
| 2177 |
KU002177 |
Inspection, Testing, and Maintenance Tasks — Figure L.5(e) All Metal Inside the Circuit Breaker Was Vaporized or Melted. |
no_media_needed |
| 2178 |
KU002178 |
Inspection, Testing, and Maintenance Tasks — 5.2 Million (US) Loss |
media_required |
| 2179 |
KU002179 |
Inspection, Testing, and Maintenance Tasks — 13.8 kV transformer, switchgear, and battery bank with charging system to support expanded production |
no_media_needed |
| 2180 |
KU002180 |
Inspection, Testing, and Maintenance Tasks — Figure L.7(a) The Circuit Breaker Fed This Battery Bank, which Lost All Power. |
no_media_needed |
| 2181 |
KU002181 |
Inspection, Testing, and Maintenance Tasks — Figure L.7(b) Transformer (foreground) and Reactor Destroyed by Fault Current. |
no_media_needed |
| 2182 |
KU002182 |
Inspection, Testing, and Maintenance Tasks — Resistive measurements of the motor windings were performed and recorded for six years. |
no_media_needed |
| 2183 |
KU002183 |
Inspection, Testing, and Maintenance Tasks — ewes Wk, ee) CH \ 4 ea ea ee | \) sean Fue bl Hef, AES | ae Se Ta Ta S| eee | FR Bearer els ol WA MA Res Ch See | 5 Beas |
no_media_needed |
| 2184 |
KU002184 |
Inspection, Testing, and Maintenance Tasks — Figure L.9(b) Close-up View of Main Circuit Breaker Lug Failure. |
media_required |
| 2185 |
KU002185 |
Inspection, Testing, and Maintenance Tasks — After consultations between the owner and repair firms, it was determined that there could be several causes for this co |
media_required |
| 2186 |
KU002186 |
Inspection, Testing, and Maintenance Tasks — procedures in the operating room were cancelled. |
media_required |
| 2187 |
KU002187 |
Inspection, Testing, and Maintenance Tasks — 1.2 Other Publications |
no_media_needed |
| 2188 |
KU002188 |
Inspection, Testing, and Maintenance Tasks — 1.2.3 FEMA Publications |
media_required |
| 2189 |
KU002189 |
Inspection, Testing, and Maintenance Tasks — ANSI/IEEE C62.41, Recommended Practice for Surge Voltages in Low-Voltage AC Power Circuits, 1991. |
no_media_needed |
| 2190 |
KU002190 |
Inspection, Testing, and Maintenance Tasks — IEEE 1159, Recommended Practice for Monitoring Electric Power Quality, 2019. |
no_media_needed |
| 2191 |
KU002191 |
Inspection, Testing, and Maintenance Tasks — 1.2.7 NEMA Publications |
no_media_needed |
| 2192 |
KU002192 |
Inspection, Testing, and Maintenance Tasks — 1.2.9 NIST Publications |
no_media_needed |
| 2193 |
KU002193 |
Inspection, Testing, and Maintenance Tasks — Title 29, Code of Federal Regulations, Part 1910.242(b), “Hand and Portable Powered Tools and Equipment, General — Compr |
no_media_needed |
| 2194 |
KU002194 |
Inspection, Testing, and Maintenance Tasks — M.2 Informational References. |
no_media_needed |
| 2195 |
KU002195 |
Inspection, Testing, and Maintenance Tasks — 2.4 IEEE Publications |
no_media_needed |
| 2196 |
KU002196 |
Inspection, Testing, and Maintenance Tasks — 2.5 McGraw-Hill Publications |
no_media_needed |
| 2197 |
KU002197 |
Inspection, Testing, and Maintenance Tasks — 2.8 NSC Publications |
no_media_needed |
| 2198 |
KU002198 |
Risk, Safety, and Failure Prevention — 3.3.48 Predictive Techniques |
no_media_needed |
| 2199 |
KU002199 |
Risk, Safety, and Failure Prevention — 0.5 cycle to 1 minute |
no_media_needed |
| 2200 |
KU002200 |
Risk, Safety, and Failure Prevention — 3.3.65 Unbalanced Voltages |
media_required |