| 2001 |
KU002001 |
Inspection, Testing, and Maintenance Tasks — BACK-UP POWER SYSTEM INSPECTION CHECKLIST For use of this form see TM 5-694: the proponent agency is COE. |
media_required |
| 2002 |
KU002002 |
Inspection, Testing, and Maintenance Tasks — Figure E.25 Typical Back-Up Power System Inspection Checklist. |
media_required |
| 2003 |
KU002003 |
Inspection, Testing, and Maintenance Tasks — INSULATION RESISTANCE-DIELECTRIC ABSORPTION TEST SHEET FOR POWER CABL' Test No, —______ «Company Date ————___________ __ |
no_media_needed |
| 2004 |
KU002004 |
Inspection, Testing, and Maintenance Tasks — Figure E.26 Typical Insulation Resistance–Dielectric Absorption Test Sheet for Power Cable. |
no_media_needed |
| 2005 |
KU002005 |
Inspection, Testing, and Maintenance Tasks — CABLE TEST SHEET Company Date Job No. |
no_media_needed |
| 2006 |
KU002006 |
Inspection, Testing, and Maintenance Tasks — Figure E.27 Typical Cable Test Sheet. |
no_media_needed |
| 2007 |
KU002007 |
Inspection, Testing, and Maintenance Tasks — 1.5 Good *------------ 3to4 Questionable ------- 1 |
no_media_needed |
| 2008 |
KU002008 |
Inspection, Testing, and Maintenance Tasks — Figure E.28 Typical Insulation Resistance Test Record. |
no_media_needed |
| 2009 |
KU002009 |
Inspection, Testing, and Maintenance Tasks — INSULATION RESISTANCE TEST RECORD FOR ROTATING MACHINERY Reference: ANSI/IEEE 43, Recommended Practice for Scope: Testin |
no_media_needed |
| 2010 |
KU002010 |
Inspection, Testing, and Maintenance Tasks — Figure E.29 Typical Insulation Resistance Test Record for Rotating Machinery. |
media_required |
| 2011 |
KU002011 |
Inspection, Testing, and Maintenance Tasks — MOTOR TEST INFORMATION SHEET NO. |
no_media_needed |
| 2012 |
KU002012 |
Inspection, Testing, and Maintenance Tasks — Figure E.30 Typical Motor Test Information Form. |
no_media_needed |
| 2013 |
KU002013 |
Inspection, Testing, and Maintenance Tasks — GROUNDING SYSTEM RESISTANCE TEST SHEET NO. |
no_media_needed |
| 2014 |
KU002014 |
Inspection, Testing, and Maintenance Tasks — Figure E.31 Typical Ground System Resistance Test Report. |
no_media_needed |
| 2015 |
KU002015 |
Inspection, Testing, and Maintenance Tasks — 0.1 ohm NEW CONSTRUCTION WET: LOCATIONS: 12 MONTHE: 0 |
no_media_needed |
| 2016 |
KU002016 |
Inspection, Testing, and Maintenance Tasks — Figure E.32 Typical Ground Test Inspection Report — Health Care Facilities. |
no_media_needed |
| 2017 |
KU002017 |
Inspection, Testing, and Maintenance Tasks — LINE ISOLATION MONITOR TEST DATA — HEALTH CARE FACILITIES SHEET oF CUSTOMER DATE ___ PROJECT NO. |
no_media_needed |
| 2018 |
KU002018 |
Inspection, Testing, and Maintenance Tasks — Figure E.33 Typical Line Isolation Monitor Test Data Report — Health Care Facilities. |
no_media_needed |
| 2019 |
KU002019 |
Inspection, Testing, and Maintenance Tasks — TORQUE VALUE RECORD SHEETNO. |
no_media_needed |
| 2020 |
KU002020 |
Inspection, Testing, and Maintenance Tasks — Figure E.34 Typical Torque Value Record. |
media_required |
| 2021 |
KU002021 |
Inspection, Testing, and Maintenance Tasks — MAIN POWER ENERGIZATION CHECKLIST For use of this form see TM 5-694: the proponent agency is COE. |
no_media_needed |
| 2022 |
KU002022 |
Inspection, Testing, and Maintenance Tasks — Figure E.35 Typical Main Power Energization Checklist. |
no_media_needed |
| 2023 |
KU002023 |
Inspection, Testing, and Maintenance Tasks — Facility Identification Jok INSTRUCTIONS TO CONTRACTOR Date: Contractor Name: Address: —$——__$_$_$_$§_§_i City, State, Z |
media_required |
| 2024 |
KU002024 |
Inspection, Testing, and Maintenance Tasks — Figure E.36 Instructions to Contractor. |
no_media_needed |
| 2025 |
KU002025 |
Inspection, Testing, and Maintenance Tasks — Facility Identification Jol PROJECT SCOPE OF WORK Introduction This Scope of Work document will define the maintenance a |
no_media_needed |
| 2026 |
KU002026 |
Inspection, Testing, and Maintenance Tasks — Facility Identification Jol PROJECT SCOPE OF WORK (continued) Specific Task Description Contractor will perform the spec |
media_required |
| 2027 |
KU002027 |
Inspection, Testing, and Maintenance Tasks — Figure E.37 Project Scope of Work Template. |
no_media_needed |
| 2028 |
KU002028 |
Inspection, Testing, and Maintenance Tasks — PROJECT SCOPE OF WORK QUOTE FORM Location: Project No. |
no_media_needed |
| 2029 |
KU002029 |
Inspection, Testing, and Maintenance Tasks — Figure E.38 Project Scope of Work Form. |
media_required |
| 2030 |
KU002030 |
Inspection, Testing, and Maintenance Tasks — PROJECT SCOPE OF WORK MODIFICATION QUOTE FORM Location: Project No. |
no_media_needed |
| 2031 |
KU002031 |
Inspection, Testing, and Maintenance Tasks — Figure E.39 Project Scope of Work Modification Form. |
no_media_needed |
| 2032 |
KU002032 |
Inspection, Testing, and Maintenance Tasks — Figure E.40 Cover and Contents. |
no_media_needed |
| 2033 |
KU002033 |
Inspection, Testing, and Maintenance Tasks — POINTS OF CONTACT Installation: Address: Names Titles Office Symbols Phones Contractor’s Name: Address: Names Titles Off |
no_media_needed |
| 2034 |
KU002034 |
Inspection, Testing, and Maintenance Tasks — Figure E.41 Points of Contact. |
no_media_needed |
| 2035 |
KU002035 |
Inspection, Testing, and Maintenance Tasks — POWER DISTRIBUTION UNIT (PDU) SURVEY Date: Installation: Location: Power Distribution Unit (PDU) Identification: Manufac |
no_media_needed |
| 2036 |
KU002036 |
Inspection, Testing, and Maintenance Tasks — POWER DISTRIBUTION UNIT (PDU) SURVEY (continued) Deficiencies found Problems in the past Customer’s concerns |
no_media_needed |
| 2037 |
KU002037 |
Inspection, Testing, and Maintenance Tasks — Figure E.42 Power Distribution Unit (PDU) Survey. |
no_media_needed |
| 2038 |
KU002038 |
Inspection, Testing, and Maintenance Tasks — GENERATOR SET SURVEY Date: Installation: Location: Number of generator sets at this location: Generator Set #1 Physical |
media_required |
| 2039 |
KU002039 |
Inspection, Testing, and Maintenance Tasks — GENERATOR SET SURVEY (continued) Generator Set #3 Physical Conditions: Good condition ODamage ONotinuse UO Need repair Q |
no_media_needed |
| 2040 |
KU002040 |
Inspection, Testing, and Maintenance Tasks — Figure E.43 Generator Set Survey. |
no_media_needed |
| 2041 |
KU002041 |
Inspection, Testing, and Maintenance Tasks — ELECTRICAL PANEL SURVEY Date: Installation: Location: Panel Identification: Manufacturer Name: Panel Type/Model: Voltage |
no_media_needed |
| 2042 |
KU002042 |
Inspection, Testing, and Maintenance Tasks — ELECTRICAL PANEL SURVEY (continued) Other Circuit Breakers Circuit breaker rating: A 3 Ph or Single: How many CB: in the |
no_media_needed |
| 2043 |
KU002043 |
Inspection, Testing, and Maintenance Tasks — Figure E.44 Electrical Panel Survey. |
no_media_needed |
| 2044 |
KU002044 |
Inspection, Testing, and Maintenance Tasks — INVERTER SURVEY Date: Installation: Location: Inverter Identification: Number of inverters at this location: Do they all |
no_media_needed |
| 2045 |
KU002045 |
Inspection, Testing, and Maintenance Tasks — INVERTER SURVEY (continued) Deficiencies Found Problems in the Past Notes |
media_required |
| 2046 |
KU002046 |
Inspection, Testing, and Maintenance Tasks — Figure E.45 Inverter Survey. |
no_media_needed |
| 2047 |
KU002047 |
Inspection, Testing, and Maintenance Tasks — BUILDING LIGHTNING PROTECTION SURVEY Date: Installation: Building #: Physical Conditions O Good Condition O Rust/Corrosi |
media_required |
| 2048 |
KU002048 |
Inspection, Testing, and Maintenance Tasks — BUILDING LIGHTNING PROTECTION SURVEY (continued) Deficiencies Found Problems in the Past Sketch the roof floor plan and |
no_media_needed |
| 2049 |
KU002049 |
Inspection, Testing, and Maintenance Tasks — Figure E.46 Building Lightning Protection Survey. |
no_media_needed |
| 2050 |
KU002050 |
Inspection, Testing, and Maintenance Tasks — RECTIFIER SURVEY Date: Installation: Location: Rectifier Identification: Number of units at this location: Do they all h |
no_media_needed |
| 2051 |
KU002051 |
Inspection, Testing, and Maintenance Tasks — RECTIFIER SURVEY (continued) Deficiencies Found Problems in the Past Customer’s Concerns Notes |
no_media_needed |
| 2052 |
KU002052 |
Inspection, Testing, and Maintenance Tasks — Figure E.47 Rectifier Survey. |
no_media_needed |
| 2053 |
KU002053 |
Inspection, Testing, and Maintenance Tasks — ELECTRICAL PANEL SURVEY Date: Installation: Location: Panel Identification: Manufacturer Name: Panel Type/Model: Voltage |
media_required |
| 2054 |
KU002054 |
Inspection, Testing, and Maintenance Tasks — ELECTRICAL PANEL SURVEY (continued) Other Circuit Breakers CB rating: A How many CB: Conductor sizes: in the Panel CB ra |
no_media_needed |
| 2055 |
KU002055 |
Inspection, Testing, and Maintenance Tasks — Figure E.48 Electrical Panel Survey. |
no_media_needed |
| 2056 |
KU002056 |
Inspection, Testing, and Maintenance Tasks — TRANSFER SWITCHES SURVEY Date: Installation: Location: Transfer Switch Identification: Manufacturer Name: Model/Type: Se |
no_media_needed |
| 2057 |
KU002057 |
Inspection, Testing, and Maintenance Tasks — TRANSFER SWITCHES SURVEY (continued) Operation Scheme Make before break? |
no_media_needed |
| 2058 |
KU002058 |
Inspection, Testing, and Maintenance Tasks — Figure E.49 Transfer Switches Survey. |
no_media_needed |
| 2059 |
KU002059 |
Inspection, Testing, and Maintenance Tasks — POWER TRANSFORMERS SURVEY Date. |
no_media_needed |
| 2060 |
KU002060 |
Inspection, Testing, and Maintenance Tasks — POWER TRANSFORMERS SURVEY (continued) Temperature Winding temperature range: Bus temperature range: Enclosure temperatur |
media_required |
| 2061 |
KU002061 |
Inspection, Testing, and Maintenance Tasks — Figure E.50 Power Transformers Survey. |
no_media_needed |
| 2062 |
KU002062 |
Inspection, Testing, and Maintenance Tasks — UNINTERRUPTIBLE POWER SYSTEM SURVEY Date: Installation: Location: UPS System Identification: Number of modules: Do these |
no_media_needed |
| 2063 |
KU002063 |
Inspection, Testing, and Maintenance Tasks — UNINTERRUPTIBLE POWER SYSTEM SURVEY (continued) Batteries Manufacturer: Model: Type: Number of battery banks: Number of |
no_media_needed |
| 2064 |
KU002064 |
Inspection, Testing, and Maintenance Tasks — Figure E.51 Uninterruptible Power System Survey. |
no_media_needed |
| 2065 |
KU002065 |
Inspection, Testing, and Maintenance Tasks — a, EE 3 < i a 2 °| 2 S g| & 2 | [2| & a #| 3a 3| gs | as é 2 Z|e| # Zla| 2 a > 3 nt Oo ¢ a< wi 7 & c 3 S| & <a os g| § E |
no_media_needed |
| 2066 |
KU002066 |
Inspection, Testing, and Maintenance Tasks — Figure E.52 Low-Voltage Breaker Data Record. |
no_media_needed |
| 2067 |
KU002067 |
Inspection, Testing, and Maintenance Tasks — cfm oR low eo | | | | sr le] fertile: | | | 1 ee EOE @lO:rlerle| | | ft | Ee; | | | | [ | ye ESS: Glor1Qexi@er |_| seo e |
no_media_needed |
| 2068 |
KU002068 |
Inspection, Testing, and Maintenance Tasks — Figure F.1 NEMA Configurations for General-Purpose Nonlocking Plugs and Receptacles. |
no_media_needed |
| 2069 |
KU002069 |
Inspection, Testing, and Maintenance Tasks — yw [Poy [| [| | [| | Tt Tt dee [?] | ojoy | | | | | epee tet | ft | | ft [ fT fT fT amy | | | | | {| | ft ls [FESS PO lO |
media_required |
| 2070 |
KU002070 |
Inspection, Testing, and Maintenance Tasks — Figure F.2 NEMA Configurations for Locking Plugs and Receptacles. |
no_media_needed |
| 2071 |
KU002071 |
Inspection, Testing, and Maintenance Tasks — PRIMARY CONTACT MATRIX ome Fai ange Cd Information Technology (FY Manager Cd Hasardoos Material (Hoe Mat Team [TT eal Re |
no_media_needed |
| 2072 |
KU002072 |
Inspection, Testing, and Maintenance Tasks — PRIMARY CONTACT MATRIX (continued) eae Ftential energenay | Utity euply Cd fe a a! |
no_media_needed |
| 2073 |
KU002073 |
Inspection, Testing, and Maintenance Tasks — 1.1 Before storage, when equipment is received, it should be inspected for shipping damage, and reports should be made as re |
no_media_needed |
| 2074 |
KU002074 |
Inspection, Testing, and Maintenance Tasks — 2.1.2 Space heaters furnished with the equipment should be connected to a continuous source of power of the proper rating |
media_required |
| 2075 |
KU002075 |
Inspection, Testing, and Maintenance Tasks — 4.1 Indoor storage should be provided for all motors and generators except motors designed for outdoor use, which can be sto |
no_media_needed |
| 2076 |
KU002076 |
Inspection, Testing, and Maintenance Tasks — 4.7 Every 3 months, insulation resistance values of each winding of units rated 2300 volts and higher should be measured and |
media_required |
| 2077 |
KU002077 |
Inspection, Testing, and Maintenance Tasks — 5.1 Indoor storage should be provided for all transformers except the following: • (1) Transformers intended for outdoor ins |
no_media_needed |
| 2078 |
KU002078 |
Inspection, Testing, and Maintenance Tasks — 5.6 Primary Disconnect Switches |
media_required |
| 2079 |
KU002079 |
Inspection, Testing, and Maintenance Tasks — 7.2 Batteries that have been shipped dry and charged should have the seals inspected when they are received at the site |
media_required |
| 2080 |
KU002080 |
Inspection, Testing, and Maintenance Tasks — 1.1.2 Operational Availability |
no_media_needed |
| 2081 |
KU002081 |
Inspection, Testing, and Maintenance Tasks — 1.2.2 Preventive Maintenance |
no_media_needed |
| 2082 |
KU002082 |
Inspection, Testing, and Maintenance Tasks — 2.2 Increased Availability |
no_media_needed |
| 2083 |
KU002083 |
Inspection, Testing, and Maintenance Tasks — 3.1.3.3 Maintainability |
no_media_needed |
| 2084 |
KU002084 |
Inspection, Testing, and Maintenance Tasks — 0.993467721 Accumulator, Pressurized |
no_media_needed |
| 2085 |
KU002085 |
Inspection, Testing, and Maintenance Tasks — 0.998149212 Above Ground 0 |
no_media_needed |
| 2086 |
KU002086 |
Inspection, Testing, and Maintenance Tasks — 0.986993503 Chiller, Screw, >300 Tons |
no_media_needed |
| 2087 |
KU002087 |
Inspection, Testing, and Maintenance Tasks — 0.988952766 Control Panel, HVAC/Chillers/AHUs, wo/Switchgear |
no_media_needed |
| 2088 |
KU002088 |
Inspection, Testing, and Maintenance Tasks — 0.998510134* Mechanical 0 |
no_media_needed |
| 2089 |
KU002089 |
Inspection, Testing, and Maintenance Tasks — 0.957963867 Motor Starter 0 |
media_required |
| 2090 |
KU002090 |
Inspection, Testing, and Maintenance Tasks — 0.998103531* Piping, Water, >8 ≤12 in |
no_media_needed |
| 2091 |
KU002091 |
Inspection, Testing, and Maintenance Tasks — 0.993744427 Automatic Transfer 0 |
no_media_needed |
| 2092 |
KU002092 |
Inspection, Testing, and Maintenance Tasks — 0.993549151 Receiver 0 |
no_media_needed |
| 2093 |
KU002093 |
Inspection, Testing, and Maintenance Tasks — 0.990661925 UPS, Small Computer Room Floor |
no_media_needed |
| 2094 |
KU002094 |
Inspection, Testing, and Maintenance Tasks — 0.992808232 Valve Operator, Electric |
no_media_needed |
| 2095 |
KU002095 |
Inspection, Testing, and Maintenance Tasks — 6.4 The purpose of preventive maintenance is not to prevent every component failure from occurring but to prevent the system |
no_media_needed |
| 2096 |
KU002096 |
Inspection, Testing, and Maintenance Tasks — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 2097 |
KU002097 |
Inspection, Testing, and Maintenance Tasks — 6.5 Basic Block Diagram of the RCM Process |
no_media_needed |
| 2098 |
KU002098 |
Inspection, Testing, and Maintenance Tasks — 6.6 Example of FMECA |
no_media_needed |
| 2099 |
KU002099 |
Inspection, Testing, and Maintenance Tasks — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to p |
media_required |
| 2100 |
KU002100 |
Inspection, Testing, and Maintenance Tasks — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |