| 601 |
KU000601 |
Administration, Scope, and Application — Figure E.50 Power Transformers Survey. |
no_media_needed |
| 602 |
KU000602 |
Administration, Scope, and Application — UNINTERRUPTIBLE POWER SYSTEM SURVEY Date: Installation: Location: UPS System Identification: Number of modules: Do these |
no_media_needed |
| 603 |
KU000603 |
Administration, Scope, and Application — UNINTERRUPTIBLE POWER SYSTEM SURVEY (continued) Batteries Manufacturer: Model: Type: Number of battery banks: Number of |
no_media_needed |
| 604 |
KU000604 |
Administration, Scope, and Application — Figure E.51 Uninterruptible Power System Survey. |
no_media_needed |
| 605 |
KU000605 |
Administration, Scope, and Application — a, EE 3 < i a 2 °| 2 S g| & 2 | [2| & a #| 3a 3| gs | as é 2 Z|e| # Zla| 2 a > 3 nt Oo ¢ a< wi 7 & c 3 S| & <a os g| § E |
no_media_needed |
| 606 |
KU000606 |
Administration, Scope, and Application — Figure E.52 Low-Voltage Breaker Data Record. |
no_media_needed |
| 607 |
KU000607 |
Administration, Scope, and Application — cfm oR low eo | | | | sr le] fertile: | | | 1 ee EOE @lO:rlerle| | | ft | Ee; | | | | [ | ye ESS: Glor1Qexi@er |_| seo e |
no_media_needed |
| 608 |
KU000608 |
Administration, Scope, and Application — Figure F.1 NEMA Configurations for General-Purpose Nonlocking Plugs and Receptacles. |
no_media_needed |
| 609 |
KU000609 |
Administration, Scope, and Application — yw [Poy [| [| | [| | Tt Tt dee [?] | ojoy | | | | | epee tet | ft | | ft [ fT fT fT amy | | | | | {| | ft ls [FESS PO lO |
media_required |
| 610 |
KU000610 |
Administration, Scope, and Application — Figure F.2 NEMA Configurations for Locking Plugs and Receptacles. |
no_media_needed |
| 611 |
KU000611 |
Administration, Scope, and Application — PRIMARY CONTACT MATRIX ome Fai ange Cd Information Technology (FY Manager Cd Hasardoos Material (Hoe Mat Team [TT eal Re |
no_media_needed |
| 612 |
KU000612 |
Administration, Scope, and Application — PRIMARY CONTACT MATRIX (continued) eae Ftential energenay | Utity euply Cd fe a a! |
no_media_needed |
| 613 |
KU000613 |
Administration, Scope, and Application — 1.1 Before storage, when equipment is received, it should be inspected for shipping damage, and reports should be made as re |
no_media_needed |
| 614 |
KU000614 |
Administration, Scope, and Application — 2.1.2 Space heaters furnished with the equipment should be connected to a continuous source of power of the proper rating |
media_required |
| 615 |
KU000615 |
Administration, Scope, and Application — 4.1 Indoor storage should be provided for all motors and generators except motors designed for outdoor use, which can be sto |
no_media_needed |
| 616 |
KU000616 |
Administration, Scope, and Application — 4.7 Every 3 months, insulation resistance values of each winding of units rated 2300 volts and higher should be measured and |
media_required |
| 617 |
KU000617 |
Administration, Scope, and Application — 5.1 Indoor storage should be provided for all transformers except the following: • (1) Transformers intended for outdoor ins |
no_media_needed |
| 618 |
KU000618 |
Administration, Scope, and Application — 5.6 Primary Disconnect Switches |
media_required |
| 619 |
KU000619 |
Administration, Scope, and Application — 7.2 Batteries that have been shipped dry and charged should have the seals inspected when they are received at the site |
media_required |
| 620 |
KU000620 |
Administration, Scope, and Application — 1.1.2 Operational Availability |
no_media_needed |
| 621 |
KU000621 |
Administration, Scope, and Application — 1.2.2 Preventive Maintenance |
no_media_needed |
| 622 |
KU000622 |
Administration, Scope, and Application — 2.2 Increased Availability |
no_media_needed |
| 623 |
KU000623 |
Administration, Scope, and Application — 3.1.3.3 Maintainability |
no_media_needed |
| 624 |
KU000624 |
Administration, Scope, and Application — 0.993467721 Accumulator, Pressurized |
no_media_needed |
| 625 |
KU000625 |
Administration, Scope, and Application — 0.998149212 Above Ground 0 |
no_media_needed |
| 626 |
KU000626 |
Administration, Scope, and Application — 0.986993503 Chiller, Screw, >300 Tons |
no_media_needed |
| 627 |
KU000627 |
Administration, Scope, and Application — 0.988952766 Control Panel, HVAC/Chillers/AHUs, wo/Switchgear |
no_media_needed |
| 628 |
KU000628 |
Administration, Scope, and Application — 0.998510134* Mechanical 0 |
no_media_needed |
| 629 |
KU000629 |
Administration, Scope, and Application — 0.957963867 Motor Starter 0 |
media_required |
| 630 |
KU000630 |
Administration, Scope, and Application — 0.998103531* Piping, Water, >8 ≤12 in |
no_media_needed |
| 631 |
KU000631 |
Administration, Scope, and Application — 0.993744427 Automatic Transfer 0 |
no_media_needed |
| 632 |
KU000632 |
Administration, Scope, and Application — 0.993549151 Receiver 0 |
no_media_needed |
| 633 |
KU000633 |
Administration, Scope, and Application — 0.990661925 UPS, Small Computer Room Floor |
no_media_needed |
| 634 |
KU000634 |
Administration, Scope, and Application — 0.992808232 Valve Operator, Electric |
no_media_needed |
| 635 |
KU000635 |
Administration, Scope, and Application — 6.4 The purpose of preventive maintenance is not to prevent every component failure from occurring but to prevent the system |
no_media_needed |
| 636 |
KU000636 |
Administration, Scope, and Application — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 637 |
KU000637 |
Administration, Scope, and Application — 6.5 Basic Block Diagram of the RCM Process |
no_media_needed |
| 638 |
KU000638 |
Administration, Scope, and Application — 6.6 Example of FMECA |
no_media_needed |
| 639 |
KU000639 |
Administration, Scope, and Application — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to prov |
media_required |
| 640 |
KU000640 |
Administration, Scope, and Application — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |
| 641 |
KU000641 |
Administration, Scope, and Application — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 642 |
KU000642 |
Administration, Scope, and Application — 1.1 Availability |
no_media_needed |
| 643 |
KU000643 |
Administration, Scope, and Application — 1.2.1 Corrective Maintenance |
no_media_needed |
| 644 |
KU000644 |
Administration, Scope, and Application — 1.4 Reliability-Centered Maintenance (RCM) |
no_media_needed |
| 645 |
KU000645 |
Administration, Scope, and Application — 3.1.3 Basic Reliability |
no_media_needed |
| 646 |
KU000646 |
Administration, Scope, and Application — Table I.4 Reliability and Maintainability Information for RCM Analysis Calculated Data Formula for Calculation Ai, Inher |
no_media_needed |
| 647 |
KU000647 |
Administration, Scope, and Application — 0.993006248 Battery, Gel Cell-Sealed, Strings |
no_media_needed |
| 648 |
KU000648 |
Administration, Scope, and Application — 0.992748496 Cable, Insulated, DC, Per 100 ft |
no_media_needed |
| 649 |
KU000649 |
Administration, Scope, and Application — 0.994487152 Vacuum 0 |
media_required |
| 650 |
KU000650 |
Administration, Scope, and Application — 0.978172315 Drive, Adjustable Speed |
no_media_needed |
| 651 |
KU000651 |
Administration, Scope, and Application — 0.996596565 Heat Exchanger, Water To Water |
no_media_needed |
| 652 |
KU000652 |
Administration, Scope, and Application — 0.161029030 Motor, Mechanical, Gas |
no_media_needed |
| 653 |
KU000653 |
Administration, Scope, and Application — 0.998867884 Sending Unit, Air Velocity |
no_media_needed |
| 654 |
KU000654 |
Administration, Scope, and Application — 0.996326697 Switch, Static, >600 ≤1000 amp |
no_media_needed |
| 655 |
KU000655 |
Administration, Scope, and Application — 0.999393210* Transformer, Dry, Air Cooled, >500kVA ≤1500kVA |
no_media_needed |
| 656 |
KU000656 |
Administration, Scope, and Application — 0.999827547 Valve, Gate, N |
no_media_needed |
| 657 |
KU000657 |
Administration, Scope, and Application — 6.1 Part of an effective RCM program is to determine the failure modes effects and conduct criticality analysis (FMECA) of a |
no_media_needed |
| 658 |
KU000658 |
Administration, Scope, and Application — Define the system— Identify levels of indenture Define ground rules and assumptions Construct equipment tree Identify fa |
no_media_needed |
| 659 |
KU000659 |
Administration, Scope, and Application — 6.5 Basic Block Diagram of the RCM Process |
media_required |
| 660 |
KU000660 |
Administration, Scope, and Application — 6.6 Example of FMECA |
no_media_needed |
| 661 |
KU000661 |
Administration, Scope, and Application — 6.6.2.4 With availability metrics representative of system configuration now available, component availability is ranked to prov |
no_media_needed |
| 662 |
KU000662 |
Administration, Scope, and Application — 6.6.3.2 Severity rankings used are as shown in Table I |
no_media_needed |
| 663 |
KU000663 |
Administration, Scope, and Application — 6.6.4.2 This calculation will be performed for every subsystem item in the master equipment listing |
no_media_needed |
| 664 |
KU000664 |
Administration, Scope, and Application — wy ai3 aes 23'S EOg we Ege , g <4 o 50 goo o = m | gga sos Ep bas s ° 5 Bes co 5 ie § Q ¢ = xc a Q A a rd 3 < ge Ee = =x |
no_media_needed |
| 665 |
KU000665 |
Administration, Scope, and Application — Figure E.53 Recloser Data Record. |
no_media_needed |
| 666 |
KU000666 |
Administration, Scope, and Application — me 28 BS a 2 te ga 20 && & a a a) eg fs 23 aE g vo. |
no_media_needed |
| 667 |
KU000667 |
Administration, Scope, and Application — 1.1 Poor power quality is an undesirable deviation or interruption of the ideal power supply |
no_media_needed |
| 668 |
KU000668 |
Administration, Scope, and Application — • (4) Reduced equipment performance and productivity • (5) Degraded data and communications Power quality disturbances c |
media_required |
| 669 |
KU000669 |
Administration, Scope, and Application — Electrical noise • (8) Interharmonics • (9) Voltage fluctuations (light flicker) Examples demonstrate waveforms with com |
no_media_needed |
| 670 |
KU000670 |
Administration, Scope, and Application — Figure J.1.1(b) Waveform of Sag Cleared by Supply Line Breaker Operation. |
no_media_needed |
| 671 |
KU000671 |
Administration, Scope, and Application — Harmonics distort and change the rms magnitude of the waveform. |
no_media_needed |
| 672 |
KU000672 |
Administration, Scope, and Application — 2.1 Harmonic Symptoms/Effects |
no_media_needed |
| 673 |
KU000673 |
Administration, Scope, and Application — • (3) Nuisance operation of protective devices • (4) Unexplained blowing of fuses on power-factor correction capacitors |
no_media_needed |
| 674 |
KU000674 |
Administration, Scope, and Application — 2.1 Example of Frequency Response Characteristic for a 1500 kVA, 13 |
media_required |
| 675 |
KU000675 |
Administration, Scope, and Application — h= resonant frequency as a multiple of the fundamental frequency (Hz) Xc= shunt capacitive reactance of capacitor (ohms) |
no_media_needed |
| 676 |
KU000676 |
Administration, Scope, and Application — Generators equipped with solid-state controls can also operate erratically in the presence of harmonics if the controls |
media_required |
| 677 |
KU000677 |
Administration, Scope, and Application — 2.3 Harmonic Surveying and Testing |
no_media_needed |
| 678 |
KU000678 |
Administration, Scope, and Application — 2.3.5 Harmonic distortion can vary significantly with load |
media_required |
| 679 |
KU000679 |
Administration, Scope, and Application — Replacement of existing equipment with higher rated equipment • (3) Use of delta-wye- or delta-delta-connected transform |
no_media_needed |
| 680 |
KU000680 |
Administration, Scope, and Application — 3.1 Transient Symptoms and Effects |
no_media_needed |
| 681 |
KU000681 |
Administration, Scope, and Application — 3.2 Causes of Transients |
no_media_needed |
| 682 |
KU000682 |
Administration, Scope, and Application — 3.4.2 Surge arresters are intended to be installed ahead of the service entrance equipment for limiting transient voltage by d |
no_media_needed |
| 683 |
KU000683 |
Administration, Scope, and Application — | 400: e x & 5 S x % 2 300. |
no_media_needed |
| 684 |
KU000684 |
Administration, Scope, and Application — 4.1 Symptoms of Sags and Swells |
no_media_needed |
| 685 |
KU000685 |
Administration, Scope, and Application — 4.3 Monitoring and Testing for Sags and Swells |
no_media_needed |
| 686 |
KU000686 |
Administration, Scope, and Application — 5.2 Causes of Long-Duration Undervoltage |
no_media_needed |
| 687 |
KU000687 |
Administration, Scope, and Application — 6.1 illustrates the typical percentage increases in motor losses and heating for various levels of voltage unbalance |
no_media_needed |
| 688 |
KU000688 |
Administration, Scope, and Application — 6.3 Monitoring and Testing of Unbalanced Voltages |
media_required |
| 689 |
KU000689 |
Administration, Scope, and Application — 6.4.6 Fuses and protective devices in each phase should be checked and replaced as needed |
media_required |
| 690 |
KU000690 |
Administration, Scope, and Application — 8.1 Symptoms of Noise |
no_media_needed |
| 691 |
KU000691 |
Administration, Scope, and Application — 8.3 Monitoring and Testing of Noise |
no_media_needed |
| 692 |
KU000692 |
Administration, Scope, and Application — 9.1 Symptoms of Interharmonics |
no_media_needed |
| 693 |
KU000693 |
Administration, Scope, and Application — 9.2 Causes of Interharmonics |
no_media_needed |
| 694 |
KU000694 |
Administration, Scope, and Application — 10.1 Voltage Fluctuations Symptoms |
no_media_needed |
| 695 |
KU000695 |
Administration, Scope, and Application — 10.3 Voltage Fluctuations Monitoring and Testing |
no_media_needed |
| 696 |
KU000696 |
Administration, Scope, and Application — Power quality audits are overall studies used to evaluate the overall power quality of the system. |
no_media_needed |
| 697 |
KU000697 |
Administration, Scope, and Application — Table J.11 Typical Power Quality Parameters to be Monitored No. |
no_media_needed |
| 698 |
KU000698 |
Administration, Scope, and Application — • (2) Securing the facility to limit damage • (3) Mobilization of recovery personnel • (4) Developing a safety plan • (5 |
media_required |
| 699 |
KU000699 |
Administration, Scope, and Application — 2.1 The Initial Event |
no_media_needed |
| 700 |
KU000700 |
Administration, Scope, and Application — 2.3 Mobilization of Recovery Personnel |
no_media_needed |